Home   ::  ABOUT US   ::  tech. standards of commercial aviation

tech. standards of commercial aviation

Technical standards of commercial aviation

 

LANDING

Aircraft maximum take-off weight. Each part of ton is considered as a whole ton.

for aircraft up to 25 tons M.T.O.W 8,00  EUR/T
for aircraft over  25 tons M.T.O.W 11,00  EUR/T

 

 

REDUCTIONS

25% For empty leg

50 % For helicopters, return flights, training and ambulance flights

50 % For technical landings and emergency flights   

75 % For test flights                     

75 % For each touch and go 

 

LIGHTING

25% of landing charge

 

PARKING

  • Aircraft maximum take-off weight. Each part of ton is considered as a whole ton.
    The minimum period for charge is 24 hours.

3 EUR per ton for 24 hours, first 4 hours are free of charge.

 

PASSENGER SERVICE CHARGE

  • international flights    10,00 EUR
  • domestic flights   5,00 EUR
  • transfer passenger   5,00 EUR
  • general aviation pax.   3,50 EUR
  • security charge  2,00 EUR
  • PRM  0,25 EUR

 

GROUND HANDLING CHARGES
 

weight (from... to... kg) price (EUR)
from 5.701 kg to 10.000 kg 100,00 
from 10.001  kg to 16.000 kg 300,00 
from 16.001  kg to 21.000 kg 432,00 
from 21.001  kg to 40.000 kg 620,00 
from 40.001  kg to 60.000 kg 792,00 
from 60.001  kg to 79.000 kg         945,00 
from 79.001  kg to  110.000 kg       1.200,00 
from 110.001  kg to  130.000 kg      1.380,00 
from 130.001  kg to  155.000 kg   1.740,00 
from 155.001  kg to  200.000 kg 2.190,00 
from 200.001  kg to  270.000 kg  2.865,00 
above270.000 kg 3.630,00 

 

REMARKS
- surcharge of 25% will be applied for:
- for handling by night (from 2000-0400 UTC)
- for handling on days of national holidays 
The maximum surcharge is 50% on two bases.

Techniucal landing
technical landing, schooling flights and ambulance fligh - 50%

Helicopters

Handling 50%
Empty flights in arrival or departure 25%
Return flights, provided that a physical change of load is not involved 25%
Test flights 75%

 

EXTENSION OF OPERATING TIME
For the provision of necessary equipment and personnel to be rendered on special request
out of official operating hours, a flat charge shall be paid :

1 hour      EUR 200,00

 

SERVICES ON REQUEST
In designated airport areas

Equipment Measure Unit Price in EUR
runway lighting 1 hour 110,00
ground power unit 1 hour 70,00
air starter 1 hour 79,00
cargo loader 1 hour 140,00
cargo platform 1 hour 79.00
forklift 1 hour 39,00
fire fighting truck 1 hour 231,00
tractor Ferguson 1 hour 29,00
tractor Leproto  1 hour 21,00
water service unit 1 hour 42,00
toilet service unit 1 hour 42,00
dolly 1 hour 7,00
passenger steps 1 hour 29,00
bus 1use 20,00
car 1use 5,00
service steps 1 hour 10,00
compress air (N,O) per aircraft 13,00

 

Catering ramp handling  Measure Unit Price in EUR
Unload/load catering supplies   per aircraft 60,00
De/Anti-icing (vehicle with manpower) Aircraft wing span (in accordance with ICAO classification) Price in EUR
<A> up to 15 m   1 operation     70,00
<B>  15 -  24 m 1 operation     90,00
<C>  24 -  36 m  1 operation     110,00
<D<  36 -  52 m   1 operation     130,00
<E>   52 -  65 m   1 operation     150,00
<F>   65 -  80 m   1 operation     170,00
Anti-icing fluid (ADF)  1 lit.    2,00
Engine used for other purposes      1 hour 150,00
Aircraft towing (tow tractor + tow bar)    
up to 60 t MTOW       1 operation    30,00
61 – 180 t MTOW           1 operation    50,00
181 – 260 t MTOW   1 operation    80,00
over  261 t MTOW  1 operation    100,00
Tow tractor used for other purposes  1 hour 200,00
Outside the airport designated areas    
bus 1 hour 20,00
van 1km 1,50
car 1km 1,50
Manpower     
high qualified     1 hour 16,00
qualified 1 hour 11,00
semi-qualified 1 hour 8,50
VIP - lounge 1 hour 30,00

*Food and drinks served in the lounge will be charged separately

VAT for foreign aircrafts is not calculated according to the Act of value added tax, section 13,
Point 1, item 4.

*REMARKS:
The lowest charge unit is 30 min.
Each minute over 30 min. is calculated like new charge unit.
Required operators are included in the price of equipment usage.
All used material will be charged cost price plus an accounting surcharge of 10%.